CostsBy the Ambient Civil team5 min read

What should a house demolition quote include?

A good demolition quote reads like a job list, not a single number. When the items are separated you can see exactly what you're paying for and what's left to you. These are the lines to look for:

Quote item What it covers Watch for
Asbestos survey A demolition survey by a competent person, with samples tested by a laboratory Sometimes quoted separately or done by an independent surveyor
Asbestos removal Licensed removal (Class A or B where required), disposal and clearance Should be its own line, priced from the survey
Service disconnections Power, gas, telecommunications, water and wastewater Network companies charge their own fees; check who applies
Demolition and load-out Machines, operators and labour to take the building down Whether hand demolition is needed near boundaries
Cartage and disposal Trucks, tip fees and recycling of timber, metal and concrete Where the waste goes and whether dockets are provided
Foundations Piles, ring foundations, concrete slab, paths and footings Often excluded unless you ask
Site clearance Trees, sheds, fences, driveways, retaining Agree what stays and what goes
Finished levels Backfilling holes and leaving the site graded and tidy "Clear and level" means different things to different contractors
Site safety Fencing, signage, dust control, traffic management Needed on busy roads and tight sites

What makes a demolition cost more, or less?

Two houses with the same floor area can have very different demolition prices. These are the factors that move the number most:

Cost driver Why it matters How to find out
Asbestos Has to be identified and removed before the house comes down. Friable asbestos needs Class A controls and costs far more than bonded sheet An asbestos demolition survey
Construction type Brick, block and concrete are heavier and slower to break and cart than timber weatherboard Site visit or plans
Foundations A concrete slab or basement is more work than timber piles Site visit; check under the floor
Access Narrow driveways, steep sections and overhead lines mean smaller machines, more trips and more labour Site visit
Neighbours close by Tight boundaries can need hand demolition, screening and extra dust and noise control Site visit
Waste and recycling Separating timber, steel and concrete lowers landfill costs; mixed waste costs more to dispose of Ask how waste is handled
Consents Heritage or special character overlays can need resource consent, which adds fees and time Unitary Plan check, demolition consent guide
Trees and site extras Protected trees, sheds, retaining walls, pools and old driveways all add scope Agree the scope in writing
Ground conditions Former orchards, fuel tanks or workshops can mean soil testing before earthworks Contaminated land and HAIL guide

Is asbestos removal part of the demolition price?

It should be priced, but as its own line. Under the Health and Safety at Work (Asbestos) Regulations 2016, if a building was built before 2000, the asbestos has to be identified before demolition, and any asbestos found has to be removed before the building comes down. That means the survey comes first and the removal price follows from what it finds. Our asbestos before demolition guide explains the survey, licences and clearance, and the asbestos removal cost guide covers what drives that part of the price.

Often not a building consent. Complete demolition of a detached building of up to three storeys is exempt under Exemption 30 of Schedule 1 of the Building Act 2004. Partial demolition and attached buildings are different, and resource consent can still be needed where a heritage or special character overlay applies. The demolition consent guide walks through each case.

How long does it take to demolish a house?

The demolition itself is usually the shortest part of the job. Most of the lead time is the work that has to happen first:

  1. Asbestos survey and lab results. Nothing can be priced firmly until you know what's there.
  2. Service disconnections. Power, gas and telecommunications are arranged with your providers; water and wastewater disconnections go through Watercare, which must approve the work.
  3. Any resource consent, if an overlay applies.
  4. Asbestos removal and clearance, before demolition starts.
  5. Demolition, load-out and site clearance.

We give you a programme with the quote, and it's realistic about the steps that depend on other people.

Partial demolition: why it costs more per square metre

Taking part of a house down (for an extension or a rebuild of one wing) is slower than a full demolition because the remaining structure has to be protected, propped and kept weathertight. More of the work is done by hand, and partial demolition generally needs a building consent. Expect the quote to include temporary support, weather protection and careful separation from the part that stays.

Can salvage or recycling reduce the cost?

Sometimes. Native timber, bricks, steel and some fittings have resale value, and clean concrete can be crushed and recycled rather than sent to landfill. Separating materials on site lowers disposal costs. It doesn't always make the job cheaper (sorting takes time), so ask each contractor how they handle waste and whether salvage is credited.

How to compare demolition quotes

Put the quotes side by side and check that each one:

  • prices the asbestos survey and removal, or clearly says they're excluded;
  • includes foundations, slabs and paths, or says they're excluded;
  • says who arranges the service disconnections;
  • describes the finished state of the site ("cleared, backfilled and graded");
  • includes cartage and disposal, and where the waste goes;
  • lists insurance and health and safety documentation.

Our guide to comparing civil contractor quotes has a full checklist.

What to send for a fast, accurate demolition quote

  • The property address and a few photos, including the driveway and access.
  • The approximate floor area, age of the house and what it's built from.
  • Any asbestos survey you already have.
  • What you want to keep: trees, fences, driveway, retaining walls.
  • Your timeframe, and what's happening next on the site.

Ask us for a free site visit and we'll come back with an itemised, fixed quote.

Sources and further reading

General information only. Every site is different: consent, engineering and safety requirements depend on your property, so check with Auckland Council or a qualified professional, or ask us for a free site visit.

About this guide. Written by the Ambient Civil team: 22 in-house crew and 20+ years of civil construction, demolition and earthworks across Auckland. Rules and licence requirements are summarised from the official sources listed above and were checked on . Rules change, so confirm your property's position with Auckland Council or a qualified professional.